Make Your Next Move A Lite Move. Call 610-755-5535
610-755-5535

Moving to New Construction in Limerick Township | Builder Guide 2025

Moving to New Construction in Limerick Township | Builder Guide 2025

Your Complete Resource for New Home Moves in Montgomery County’s Fastest-Growing Township
Professional New Construction Moving Services | LiteMovers: (610) 755-5535

Limerick’s New Construction Boom

Limerick Township continues to experience explosive growth, with its population tripling from 6,600 in 1990 to over 21,000 today. This growth shows no signs of slowing, with multiple major developments currently under construction or approved for the coming years.

The combination of Spring-Ford School District’s excellence, proximity to major employment centers, and available land has made Limerick the epicenter of new home construction in the tri-town region.

Active Builder Communities – 2025

πŸ† Toll Brothers Communities

CommunityLocationPrice FromHome SizeStatus
HearthfieldRittenhouse Rd, Royersford$899,9953,029-3,520 sq ftSelling Fast
Canterbury MeadowsUpper Providence$1,023,9953,029-3,677 sq ftActive
BoxwoodCollegeville$999,9953,520-4,658 sq ftLimited Sites
Linden RidgeCollegeville$957,9952,776-3,677 sq ftActive
Charterfield LandingCollegeville$1,084,9953,520-4,658 sq ftPremium Lots
Riverstone CrossingSpring CityContactSingle FamilyComing Soon

🏠 Pulte Homes

Lewis Pointe at Royersford
Location: Lewis Road, Royersford
Price Range: $524,990 – $600,421
Home Types: 25 Townhomes
Sizes: 3-4 bedrooms, 2,100-2,500 sq ft
Special Incentives Available!

🏘️ Lennar Homes

Villages at Spring Hill
Single Family Homes: $899,995 – $1,149,000
Townhomes: Starting ~$419,990
Current Promotion: $39,000 incentive on select homes

πŸ”¨ W.B. Homes

  • Ironwood: SOLD OUT (95 townhomes completed)
  • Hawthorne Square: 52 townhomes approved December 2025 at 311-327 W. Ridge Pike
  • 250 W. Ridge Pike: 10 townhomes under review

New Construction Price Comparison

Home TypePrice RangeSquare FeetLot SizeBest For
Townhomes$419K-$600K2,100-2,500MinimalFirst-time buyers, downsizers
Single Family Entry$800K-$950K2,700-3,2000.25-0.5 acreGrowing families
Move-Up Homes$950K-$1.2M3,200-4,0000.5-1 acreEstablished families
Estate Homes$1.2M+4,000+1+ acresLuxury buyers

Understanding the New Construction Timeline

Typical Timeline from Contract to Move-In

Months 1-2: Pre-Construction

  • Contract signing
  • Lot selection
  • Design center appointments
  • Mortgage application
  • Permit approvals

Months 3-6: Foundation to Framing

  • Site preparation
  • Foundation pour
  • Framing and roof
  • Windows and doors
  • Pre-drywall meeting

Months 7-9: Interior Work

  • Drywall installation
  • Flooring
  • Kitchen and baths
  • Trim and paint
  • Final inspections

Month 10: Closing

  • Final walkthrough
  • Blue tape items
  • Closing day
  • Keys received
  • MOVE IN!

Common New Construction Delays

Be prepared for potential delays that can affect your moving timeline:

Delay TypeTypical ImpactFrequencySolution
Weather1-4 weeksCommon (winter/spring)Flexible moving dates
Permit Issues2-6 weeksOccasionalStay in contact with builder
Supply Chain2-8 weeksLess common nowHave backup plan
Inspector Delays1-2 weeksCommonBe patient
Change Orders1-3 weeksIf requestedMinimize changes

New Construction Moving Challenges

Site Conditions

Common Issues

  • Unpaved driveways
  • Construction debris
  • Mud and dirt tracking
  • Limited parking
  • Active construction nearby
  • Unfinished landscaping

LiteMovers Solutions

  • Floor protection runners
  • Extra moving blankets
  • Strategic truck positioning
  • Coordination with builders
  • Weather contingency plans
  • Boot covers for crew

GPS and Access Issues

New streets may not appear in GPS systems for months. Provide your movers with:

  • Builder’s site map
  • Lot number and model name
  • Nearest established intersection
  • Builder’s sales office address as backup
  • Your cell phone for day-of guidance

Pre-Settlement Walkthrough Checklist

Complete this before your move to identify issues:

Exterior

  • ☐ Driveway condition
  • ☐ Walkway completion
  • ☐ Exterior doors function
  • ☐ Garage door operation
  • ☐ Outdoor outlets work
  • ☐ Grading complete

Interior

  • ☐ All rooms painted
  • ☐ Flooring installed
  • ☐ Appliances work
  • ☐ HVAC functional
  • ☐ Plumbing tested
  • ☐ Electrical complete

Builder-Specific Information

Toll Brothers Process

  • Design Studio: Limerick or Plymouth Meeting
  • Timeline: 10-14 months typically
  • Closing Process: Use their preferred title company
  • Warranty: 1-2-10 year coverage
  • Move Coordination: Site superintendent approval needed

Pulte Homes Process

  • Design Center: King of Prussia
  • Timeline: 6-9 months for townhomes
  • Incentives: Often include closing costs
  • Preferred Lender: Pulte Mortgage
  • Move-In: Coordinated through customer care

Lennar Process

  • Everything’s Included: No design center visits
  • Timeline: Often quicker (spec homes available)
  • Warranty: Comprehensive coverage
  • Smart Home: Features included standard

New Construction Moving Costs

Home SizeBase Moving CostPacking ServiceStorage (if needed)
Townhome (2,100-2,500 sq ft)$1,200-$1,600+$800-$1,200$150-$200/month
Single Family (2,700-3,500 sq ft)$1,600-$2,200+$1,200-$1,800$200-$300/month
Large Home (3,500-4,500 sq ft)$2,200-$3,000+$1,800-$2,500$300-$400/month
Estate (4,500+ sq ft)$3,000-$4,500+$2,500-$3,500$400+/month
*Add 15-20% for construction site conditions. Storage through local facilities if delays occur.

Floor Protection for New Homes

Protecting your brand-new floors is critical. LiteMovers provides:

Hardwood Protection

  • Protective floor runners
  • Furniture pads
  • No dragging policy
  • Boot covers required

Carpet Protection

  • Plastic carpet film
  • High-traffic path coverage
  • Stain prevention measures
  • Post-move inspection

Storage Solutions for Construction Delays

If your new home isn’t ready when expected, LiteMovers coordinates with local storage facilities:

Recommended Options

  • Short-term (1-2 months): PODS or PACK-RAT on-site storage
  • Medium-term (2-6 months): Climate-controlled units at Compass Self Storage
  • Flexible terms: D & L Storage with month-to-month options
  • Full-service: We pack, store, and deliver when ready

Upcoming Developments in Planning

ProjectLocationSizeStatusTimeline
Providence PropertiesSanatoga Rd235 single-family homesUnder Review2026-2028
Limerick Commerce CenterPossum Hollow RdMixed-use developmentUnder Review2026+
1 & 15 Neiffer RoadNeiffer/Ridge Pike34 townhomesApproved2025-2026
Emerald CrossingTBD67 townhomesUnder Review2026+

First-Time New Construction Buyer Tips

Financial Considerations

  1. Budget for upgrades: Base price is just the starting point
  2. Understand builder incentives: Often tied to using preferred lender
  3. Plan for closing costs: 2-3% of purchase price
  4. Reserve for immediate needs: Window treatments, landscaping upgrades
  5. Factor in HOA fees: Most new developments have them ($50-$200/month)

Design Center Strategy

  • Set a firm upgrade budget before visiting
  • Focus on structural options (can’t change later)
  • Consider doing some upgrades post-closing
  • Negotiate package deals on multiple upgrades
  • Document all selections with photos

Working with LiteMovers for New Construction

Our New Construction Expertise

  • Relationships with local builders and site supervisors
  • Experience with all major Limerick developments
  • Understanding of construction site limitations
  • Flexible scheduling for closing delays
  • Proper equipment for site conditions

Special Services for New Homes

  • Pre-move consultation: Visit site before move day
  • Builder coordination: Direct communication with site manager
  • Floor protection: Professional-grade materials
  • Flexible timing: Work around builder schedules
  • Storage solutions: If delays occur
  • Setup services: Furniture assembly, picture hanging

New Construction Move Timeline

60 Days Before Closing

  • ☐ Schedule pre-move consultation with LiteMovers
  • ☐ Confirm closing date with builder (tentative)
  • ☐ Begin decluttering current home
  • ☐ Research storage options as backup

30 Days Before

  • ☐ Confirm move date with LiteMovers
  • ☐ Schedule final walk-through
  • ☐ Arrange utility connections
  • ☐ Purchase home insurance
  • ☐ Begin packing non-essentials

14 Days Before

  • ☐ Confirm closing remains on schedule
  • ☐ Complete change of address forms
  • ☐ Schedule cable/internet installation
  • ☐ Plan for first-night essentials

Closing Week

  • ☐ Final walk-through with builder
  • ☐ Document any issues
  • ☐ Closing day – get keys!
  • ☐ Walk-through with movers if possible
  • ☐ Move day coordination

Local Resources for New Homeowners

Utilities Setup

  • Electric: PECO Energy – 1-800-494-4000
  • Gas: PECO – 1-800-841-4141
  • Water: PA American Water – 1-800-565-7292
  • Trash: Varies by development (check with builder)
  • Cable/Internet: Comcast, Verizon Fios

Township Services

  • Limerick Township Building: 646 W Ridge Pike
  • Tax Office: (610) 495-6432
  • Building Permits: (610) 495-6656
  • Police Non-Emergency: (610) 495-7909

Why Choose LiteMovers for Your New Construction Move

Builder Relationships

We work regularly with:

  • Toll Brothers communities
  • Pulte Homes developments
  • Lennar projects
  • W.B. Homes sites
  • Custom builders

Local Knowledge

We know:

  • Every development in Limerick
  • Construction site protocols
  • Builder requirements
  • Local traffic patterns
  • Best routes to new developments

Get Your New Construction Move Quote

Moving to new construction in Limerick Township requires special expertise. Whether you’re building with Toll Brothers, Pulte, Lennar, or any other builder, LiteMovers ensures your move into your dream home is perfect.

Contact Us Today:

πŸ“ž (610) 755-5535
🌐 Get Your Free Quote
πŸ“§ newconstruction@litemovers.com

Licensed & Insured
PA PUC #A-8916211 | USDOT #2173383 | MC #782920


LiteMovers: The preferred moving company for new construction homes in Limerick Township and the entire Route 422 corridor.